Saturday, January 10, 2009

Preliminary Contract

SC presented us with our preliminary contract.

A few issues, e.g. site costs and door and window changes required.

See the floor plan we changed from the standard e.g. garage and outdoor area.


1 comment:

  1. Did M charge you $1000 for any redrawing or changes to the floorplan?

    Thanks

    Tim

    ReplyDelete