Plumbing and electrical work completed.

Only one stormwater line connected to the point of discharge, should be all three.
Field Gully and Gutter stormwater connected together, should be separate.
No gravel used in the stormwater trenches.

Major issues with the sewer not run to the property, to take up with developer.